The treads are level but the post is not square to the treads.
NEVER use a spirit level to square. A newel during assembly – always use a roofing square
ALWAYS use a roofing square to square newels during assembly
View our stair installation guide
The post is square to the treads but the treads are not level from side to side (i.e the whole stair is out of plumb)
1. Opening too 1 2 small or FFL too high
2. Opening too big or FFLtoo low
CHECK and confirm well opening size and finished floor height prior to manufacture
View our stair installation guide
The post is square to the treads but the treads are not level from front to back (i.e the whole stair is out of plumb)
1. Finished floor level too low
2. Finished floor level too high
CHECK and confirm finished floor height prior to manufacture
View our stair installation guide