Our staircases feature:
-
-
-
-
-
-
-
- Market-leading innovation, saving our customers time and labour
- Fully automated CNC machine production
- Newel-posts and strings are factory-prepared to fit openings as standard, saving labour on site
- Strings supplied pilot drilled for optimum fixing
- Newel-posts, strings, spindles/balusters and handrails,3-part primed as standard
- FIRA tested quick-fit, demountable pre-assembled balustrade for ease of installation
- All spindles/balusters tenoned into handrails for increased strength
- FSC & PEFC certified
Quick-fit staircases
-
-
-
-
-
-
-
- All bullnose/curtail steps are factory prepared
- Wall strings are cut to fit over trimmers
- All wall strings are factory cut to specific floor levels
Slip-resistant stair protection
-
-
-
-
-
-
-
- Removable, peel clean film for protection during the build
- provided as standard, improving site safety
Temporary Guardrail
-
-
-
-
-
-
-
- En13374:2004 compliant, temporary guardrail system available as an optional extra
Winder support bracket
-
-
-
-
-
-
-
- Removes the need for intermediate structural newel-posts
- Creates space to allow large items of furniture to be passed between floors
- CE marked
- Supplied as an optional extra, contact Staircraft with your requirements
Factory prepared staircase bulkhead
-
-
-
-
-
-
-
- Factory prepared, reducing site costs of material and labour
- Factory-fitted internal and external corner blocks as standard
- Bulkhead provides increased headroom
- Stair strings mitred, even and swept for improved appearance, reducing the need to box-in the underside of strings
Stair Installation Recommendations
At Staircraft, we have guidance for everything you need to know about fitting and constructing your staircase with our stair installation guide here.
Stair installations should be in accordance with Building Regulations, NHBC Standards and any referenced documents with particular attention to the BWF Installation Guide and the downloads below.